Methods and Procedures for Sustainable Decision Support in Operative Production Control
Project duration from 2014-03-01 to 2016-02-29
Funded by: FFG
Partners:
Funded by: FFG
Partners:
- University of Vienna
- PROFACTOR GmbH
- TRUMPF Maschinen Austria GmbH + Co. KG
- asma gmbh
- Human Research Institut für Gesundheitstechnologie und Präventionsforschung GmbH
NPS2 investigates new methods for priority-rule-based guidance and control of flexible, volatile production processes at the operational shop floor level according to user-defined strategies. To do so, complex priority rules are automatically synthesized and iteratively optimised by using meta-heuristics and simulation models. To specifically define the desired production strategies, economic, environmental and work psychological indicators are merged by holistic rating models.